skip to content
Current Lead Times: Simple-Custom Framesets: 1 week. Full Custom Bikes: 7 weeks.

U.S. Built Custom Bicycles in Titanium and Titanium-Carbon Mix

Matt’s 622 SLX

This is Matt with his new 622 SLX. We built this one with our friends Matt and Wade at The Spokesman in Santa Cruz, CA.

Matt and his 622 SLX

He says:

Hey Matt and Wade,

I have had my bike now for 1 week, and I have to say it has far exceeded my expectations and wanted to thank you both. I have to say the fit is awesome. I have done several rides in the past week from 1-3 hours each. I used to always get lower back stiffness/soreness. That does NOT happen.

The ride is fantastic, little or no vibration yet a stiff frame with great acceleration! I was going down a hill today and looked down and could not believe I was going 42+ mph!

The components you guys recommend all rock, and I really like them. Disc breaks are great. I am most surprised with how much I like the Di2. I always heard it was good, but I always thought electronic shifting, big deal can’t be that different. Wow! Was I wrong!? It is so clean and exact.

I have been riding up Hicks Rd. for years. I can’t believe that with the Seven I did my best time ever! How is that possible?! Anyway I just want to thank you guys very much for all of your help to make this happen! Thank you very much!

Matt